East Tennessee tap fees, in one table
What it costs to connect a new single-family home to water and sewer, from each utility's published schedule or figures the utility sent us. Budget for these before you buy the lot.
| Utility | Water tap | Sewer tap | Notes |
|---|---|---|---|
| West Knox Utility DistrictKnox | $1,200 (3/4") | $1,450 | Plus $35 service charge and $35 sewer inspection. Effective July 1, 2026. Schedule |
| First Utility District of Knox CountyKnox | $850 connection; new tap $500 short / $1,500 long | $1,000 connection; new tap $500 short / $1,500 long | 2026 rate schedule. Schedule |
| Knox-Chapman Utility DistrictKnox, Blount | $1,550 (3/4") | $1,800 (3/4") | Plus $30 sewer inspection. Effective March 1, 2026. Schedule |
| Knoxville Utilities Board (KUB)Knox | See schedule | From $1,700 | KUB lists $1,700 as the minimum sewer tap; long-side services can cost more. Effective July 2025. Schedule |
| Lenoir City Utilities Board (LCUB)Loudon, Knox | $1,250 (3/4") | See schedule | Older schedule (2023): confirm current fees with the utility. Water rates effective March 2023. Schedule |
| Loudon Utilities BoardLoudon | $700 connection + $1,500 capacity (3/4") | $700 connection + $6,966 capacity (3/4") | New residential service. No effective date in our record; confirm with the utility. Schedule |
| City of SeviervilleSevier | Inside city $750 short / $1,500 long; outside $1,500 / $3,000 | Inside city $1,200 / $2,400; outside $2,400 / $4,800 | FY2027. Low-pressure sewer also needs an E/One pump at the owner's cost. Schedule |
| City of Oak RidgeAnderson, Roane | $1,100 (3/4") | $425 | Plus $40 activation. Confirmed by the city in writing, Oct 2026. Schedule |
| Anderson County Water AuthorityAnderson | $1,500 (3/4") | $1,500 | Plus the cost of any additional requirements. No effective date in our record; confirm with the utility. Schedule |
| South Blount Utility DistrictBlount | $2,950 (5/8" tap and meter) | Call the office | No effective date posted. Schedule |
| Friendsville Water WorksBlount | $2,550 (5/8") | — | New water service tap. No effective date in our record; confirm with the utility. Schedule |
| Old Knoxville Highway Utility DistrictBlount | $2,000 (3/4") | Water only | 1" $2,600, 2" $3,800. Sent to us by the district, Oct 2026. |
| Athens Utilities BoardMcMinn | $1,000 (3/4" meter) | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| Bloomingdale Utility DistrictSullivan | $1,500 (3/4" residential) | — | Effective 2026-07-01. Schedule |
| Blountville Utility DistrictSullivan | $1,500 (3/4" tap) | — | Effective 2026. Schedule |
| Bristol-Bluff City U.D.Sullivan | Call the utility | — | Current fee not verified. The only published schedule we found dates from 1996, so we don't show it as a price. |
| City of Bristol TN Water & SewerSullivan | Call the utility | — | Current fee not verified. The only published schedule we found dates from 1996, so we don't show it as a price. |
| City of Elizabethton Water & SewerCarter | $650 municipal / $1,200 regional (5/8" x 3/4") | — | Effective FY2025-26. Schedule |
| City of Kingsport Water ServicesHawkins, Sullivan, Washington | $1,200.00 (5/8") | — | Effective 2026-07-01. Schedule |
| Claiborne Utilities DistrictClaiborne | $1,740.00 tap + $60.00 meter = $1,800.00 (5/8") | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| Cumberland Plateau Water AuthorityCumberland | $1,300 (residential 5/8" x 3/4" meter) | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| Eastside Utility DistrictBradley, Hamilton | $1,225.00 tap fee + $750.00 capacity fee = $1,975.00 (5/8" meter, Bradley County) | — | Effective 2026-07-01. Schedule |
| Erwin Utilities AuthorityUnicoi | $675 tap + $125 capacity = $800 inside; $1,000 + $125 = $1,125 outside corporate limit (3/4") | — | Effective 2026-07-01. Schedule |
| First Utility District of Hawkins CountyHawkins | $1,000 (3/4" tap) | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| Hixson Utility DistrictHamilton | $1,200.00 (5/8" meter) plus the cost of road repair and/or crossing | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| LaFollette Utilities BoardCampbell | $950 (3/4" service) | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| Luttrell-Blaine-Corryton Utility DistrictUnion | $1,250 standard tap + $75 service charge | — | Effective 2026-08-01. Schedule |
| North West Utility DistrictHamilton | $1,350.00 (3/4") | — | Published schedule, checked Oct 2026. No effective date in our record; confirm with the utility. Schedule |
| Ocoee Utility DistrictBradley | $1,500.00 standard meter tap fee + $1,400.00 capacity fee | — | Effective 2025-07-01. Schedule |
| Savannah Valley Utility DistrictHamilton | $1,250.00 + $500.00 capacity fee = $1,750.00 (3/4") | — | Older schedule (2022): confirm current fees with the utility. Effective Tap 2022-11-01; capacity 2025-09-01. Schedule |
| South Elizabethton Utility DistrictCarter | $650 municipal / $1,200 regional (5/8" x 3/4") | — | Effective FY2025-26. Schedule |
| Sweetwater Utilities BoardMonroe | $1,000 inside / $1,350 outside city (3/4" to 1") | — | Effective 2025-09. Schedule |
| Tennessee American Water (Chattanooga)Hamilton | $25 new service fee applied to first bill; no domestic tap fee published | — | Effective 2025-01-21. Schedule |
| Walden's Ridge Utility DistrictHamilton | $1,250 (3/4" meter) PLUS the cost of road repair and/or crossing | — | Effective 2025-01-01. Schedule |
Short side vs. long side. A short-side tap is on your side of the road. A long-side tap has to cross the road, which means boring or cutting pavement, so it costs more.
Tap fees change, usually in July when most utilities start a new budget year. Check the linked schedule, then call the utility with the address before you budget. Many charge extra for inspections, meter sets, deposits or main extensions, and a lot with no main in front of it can cost far more than the tap.
Not on the list? See the utility map and directory.
Checked October 2026 against each utility's published schedule, or against figures the utility sent us where noted. Rows marked “Older schedule” or with no effective date need a call to the utility before you budget. Amounts are minimums for a standard single-family service unless noted.